Seasonal planning Prepare heating systems for colder operating conditions with a timely performance and maintenance review. View current offers
← All servicesVentilation & heat recovery

Better Airflow Starts With a Proper Plan.

Supply and extract air must work as one system. We consider airflow paths, filtration, heat recovery, noise, controls and existing building constraints.

Discuss a Ventilation Project↗
Ventilation & heat recovery equipment and engineering
Technical scope / Building-led selection
Scope

What the service can include

01

Mechanical Ventilation

Mechanical supply and extract systems provide controlled airflow where natural ventilation is insufficient or unsuitable.

02

MVHR

Filtered outdoor air is supplied while stale indoor air is extracted, with heat transferred between separate air streams.

03

Air Handling Units

Centralised equipment for treating and distributing air, with options for filtration, heating, cooling and heat recovery.

04

Air Supply

Fresh-air supply is planned around occupancy, required airflow, filtration, distribution and comfort.

05

Air Extraction

Extract systems remove stale, humid or contaminated air, with replacement air and pressure relationships considered.

06

Filtration & Heat Recovery

Filtration and heat-recovery arrangements are selected according to system requirements, air quality and maintenance needs.

Interactive tool

Explore airflow

A practical starting point for a more informed project conversation.

SupplyOutdoor Air→Filtration→Heat Exchanger→Rooms
Heat transfer between separate air streams
ExtractRooms→Heat Exchanger→Exhaust Outdoors
Technical considerations

Decisions that shape the specification.

+Building use and occupancy
+Existing equipment and distribution
+Electrical and physical constraints
+Controls, commissioning and documents
Equipment & Application

The system is more than its principal unit.

Distribution, controls, electrical interfaces, access and maintainability all affect whether the selected arrangement works in practice.

01MVHR and central heat-recovery units
02Supply and extract fan systems
03Air handling units and filtration stages
04Ductwork, attenuators, dampers and terminals
Installation & Coordination

Technical decisions before site work.

1Establish design airflow by space use

Establish required supply and extract airflow for each occupied space.

2Coordinate routes and fire interfaces

Coordinate duct routes, access and applicable fire and building interfaces.

3Review breakout and regenerated noise

Control fan, duct and terminal noise through appropriate selection and layout.

4Balance terminals and prove control sequences

Balance airflow, verify controls and record commissioning results.

Commissioning & Handover

Evidence that supports operation.

Airflow and balancing resultsRecord measured airflow and balancing results for the agreed systems.
Filter and fan informationProvide relevant fan, filter, heat-recovery and equipment information.
Control settings and maintenance accessDocument control settings, operating information and maintenance requirements.
Pricing & cost considerations

Indicative UK & EU planning figures.

These provisional market references support initial budgeting and are not fixed prices from CLIMAFORM LTD. Final equipment, scope, taxes and project conditions require confirmation.

View full pricing guidance →Request a Quotation↗
ServiceUnited Kingdom / European Union
Residential MVHR — Supply & Installation£5,500–11,000UK€4,000–10,000EU
Commercial AHU & VentilationProject-Specific QuotationUKProject-Specific QuotationEU
Indicative market ranges for planning only. Final costs, equipment specifications and applicable taxes are confirmed in a project-specific quotation.
+Required airflow and filtration
+Duct routes, terminals and builders’ work
+Heat recovery and acoustic treatment
+Balancing, controls and commissioning
FAQ

Useful points before you enquire.

Mechanical ventilation or MVHR?+

Mechanical ventilation controls airflow. MVHR also transfers heat between separate supply and extract streams.

Can ventilation be retrofitted?+

Routes, ceiling space, terminals, fire interfaces, noise and access must be reviewed.

How is noise controlled?+

Fan selection, duct velocity, attenuators, terminals and equipment location all matter.

Is ductwork required?+

Central systems generally require ductwork; local systems may use different arrangements.

What about filters?+

Filter selection and replacement depend on the system, environment and operating conditions.

What affects cost?+

Airflow, equipment, ductwork, access, fire and acoustic requirements, balancing and commissioning affect cost.

Start a conversation

Discuss a Ventilation Project.

Request a quote↗