Seasonal planning Prepare heating systems for colder operating conditions with a timely performance and maintenance review. View current offers
← All servicesAir conditioning

Cooling Solutions Matched to the Space.

From a single room to a multi-zone commercial building, cooling should be selected around loads, occupancy, controls and practical installation routes.

Request an Air Conditioning Quote↗
Air conditioning equipment and engineering
Technical scope / Building-led selection
Scope

What the service can include

01

Single Split

One indoor unit connected to an outdoor unit, suitable for individual rooms and smaller spaces requiring independent temperature control.

02

Multi-Split

Multiple indoor units connected to one outdoor system, allowing separate room control where external space is limited.

03

Cassette Systems

Ceiling-mounted units designed for wider air distribution in offices, retail spaces and other suitable commercial interiors.

04

Ducted Air Conditioning

Concealed indoor equipment connected to ductwork, providing conditioned air through discreet ceiling or wall terminals.

05

VRF / VRV

Multi-zone systems for larger buildings, offering flexible indoor unit configurations and centralised control options.

06

Replacements & Upgrades

Assessment of existing systems to identify suitable replacement equipment, changes to controls and installation requirements.

Interactive tool

Compare systems

A practical starting point for a more informed project conversation.

Direct, room-level cooling

Straightforward control for a defined area.

Technical considerations

Decisions that shape the specification.

+Building use and occupancy
+Existing equipment and distribution
+Electrical and physical constraints
+Controls, commissioning and documents
Equipment & Application

The system is more than its principal unit.

Distribution, controls, electrical interfaces, access and maintainability all affect whether the selected arrangement works in practice.

01Wall, floor, cassette and concealed indoor units
02Single, multi-split and VRF/VRV arrangements
03Room, group and centralised controls
04Refrigerant pipework, drains and containment
Installation & Coordination

Technical decisions before site work.

1Confirm cooling loads and diversity

Review room use, occupancy, heat gains and operating patterns to inform system capacity and equipment selection.

2Coordinate indoor and outdoor locations

Consider airflow, structural support, access, noise, maintenance clearance and suitable equipment positioning.

3Review electrical supplies and condensate routes

Identify electrical requirements, pipework routes, condensate drainage and any associated building works.

4Pressure test, evacuate and commission

Coordinate refrigerant-circuit pressure testing, evacuation, commissioning and operational checks with the specialists responsible for the agreed installation scope.

Commissioning & Handover

Evidence that supports operation.

Equipment and control schedulesRecord installed equipment, relevant system details and agreed control arrangements.
Test and commissioning recordsProvide applicable test results, commissioning information and operating settings within the agreed scope.
Operating information and maintenance requirementsIdentify relevant operating instructions, maintenance recommendations and handover documents.
Pricing & cost considerations

Indicative UK & EU planning figures.

These provisional market references support initial budgeting and are not fixed prices from CLIMAFORM LTD. Final equipment, scope, taxes and project conditions require confirmation.

View full pricing guidance →Request an Air Conditioning Quote↗
ServiceUnited Kingdom / European Union
Single Split AC — Supply & Installation£1,500–3,000UK€1,500–3,200EU
Multi-Split — 2 Rooms£2,800–5,000UK€2,800–4,500EU
Multi-Split — 3–5 Rooms£4,500–10,000UK€4,500–9,000EU
Commercial VRF / VRVProject-Specific QuotationUKProject-Specific QuotationEU
Indicative market ranges for planning only. Final costs, equipment specifications and applicable taxes are confirmed in a project-specific quotation.
+System format and cooling duty
+Indoor and outdoor unit locations
+Refrigerant pipework and containment
+Electrical supplies, controls and commissioning
FAQ

Useful points before you enquire.

How is the right system selected?+

Selection considers room use, cooling demand, zoning, controls, outdoor-unit space, installation routes and maintenance access.

What is included in a standard installation?+

The agreed quotation identifies equipment, refrigerant pipework, condensate drainage, electrical interfaces, controls, testing and exclusions.

Can an existing system be upgraded?+

Existing equipment, pipework, controls and practical compatibility should be assessed first.

What access is required?+

Safe access is needed for equipment, service routes, testing and future maintenance.

What affects pricing?+

Capacity, equipment type, pipe routes, electrical work, access, controls and commissioning affect cost.

Start a conversation

Request an Air Conditioning Quote.

Request a quote↗